Biosystems Engineering
at Oklahoma State University
More Engineering
Phrases Interpreted
(7/2/99)
|
|
Afterhours |
2. Developed after years of
intensive research
- It was discovered by accident.
3. Project slightly behind
original schedule due to unforeseen difficulties
- We are working on something else.
4. The designs are well within
allowable limits
- We just made it, stretching a point or two.
5. Customer satisfaction is
believed assured
- We are so far behind schedule that the customer was happy to
get anything at all from us.
6. Close project coordination
- We should have asked someone else; or, let's spread the responsibility
for this.
7. The design will be finalized
in the next reporting period
- We haven't started this job yet, but we've got to say something.
8. A number of different approaches
are being tried
- We don't know where we're going, but we're moving.
9. Test results were extremely
gratifying
- It works, and are we surprised!
10. Extensive effort is being applied on a fresh approach to the problem
- We just hired three new guys; we'll let them kick it around for a while.
11. Preliminary operational
tests are inconclusive
- The darn thing blew up when we threw the switch.
12. The entire concept will
have to be abandoned
- The only guy who understood the thing quit.
13. Modifications are underway
to correct certain minor difficulties
- We threw the whole thing out and are starting from scratch.